Share this
Map

Conducted emissions

Accred­ited EMC test­ing, EMC pre-​compliance test­ing and EMC trou­bleshoot­ing to EMC com­pli­ance test­ing.

Contacts and Location

Description

Accred­ited EMC test­ing, EMC pre-​compliance test­ing and EMC trou­bleshoot­ing to EMC com­pli­ance test­ing.

Specification

The equipment was set up as per the test configuration to simulate typical usage per user’s manual. When the EUT is a table top equipment, a wooden turntable with a height of 0,8m is used which is placed in a distance of 0,4m from vertical conductive plane. When EUT is floor standing equipment, it is placed on the 0,1m insulation support in a distance of 0,4m from vertical conductive plane. Auxiliary equipment and/or support equipment, if needed was placed as per EN 55022 recommendations. All input/output cables were positioned to simulate typical usage as per EN 55022. EUT mains power port was connected to LISN/AMN which is placed in a distance of 0,8m. Each EUT power lead, except ground (safety), was connected through a LISN/AMN to power source. All lines and neutral of power cord where measured. All telecommunication and signal cables are connected through ISN which is located in distance of 0,8m. Each cable lead is measured according to used connection type.

Service fields

measurement -
testing -
Back to all
0 items in cart
Total: 0
You have no items in a cart
Go to checkout
Go Enquire