Share this
Map

Disturbance power emissions

Accred­ited EMC test­ing, EMC pre-​compliance test­ing and EMC trou­bleshoot­ing to EMC com­pli­ance test­ing.

Contacts and Location

Description

Accred­ited EMC test­ing, EMC pre-​compliance test­ing and EMC trou­bleshoot­ing to EMC com­pli­ance test­ing.

Specification

The equipment was set up as per the test configuration to simulate typical usage per user’s manual. When the EUT is a table top equipment, a wooden table with a height of 0,8m is used which is placed in a distance of 0,4m from other metallic objects. When EUT is floor standing equipment, it is placed on the 0,1m insulation support in a distance of 0,4m from other metallic objects. The mains lead is stretched in a straight line for a distance sufficient to accommodate the absorbing clamp, and to permit the necessary measuring adjustment of position tuning. The clamp is placed around the lead so as to measure a quantity proportional to the disturbance power on the lead. If not marked in test data the straight portion of cable is 6m long and it is placed on slide bar 0,8 above the ground floor. If original lead of appliance is shorter than the necessary length it is extended or replaced by similar lead. Any plug or socket that doesn’t pass through the absorbing clamp due to its size is removed.

Service fields

analyse -
measurement -
testing -
Back to all
0 items in cart
Total: 0
You have no items in a cart
Go to checkout
Go Enquire