Share this
Map

Electric fast transients EFT/Burst immunity

Accred­ited EMC test­ing, EMC pre-​compliance test­ing and EMC trou­bleshoot­ing to EMC com­pli­ance test­ing.

Contacts and Location

Description

Accred­ited EMC test­ing, EMC pre-​compliance test­ing and EMC trou­bleshoot­ing to EMC com­pli­ance test­ing.

Specification

The equipment was set up as per the test configuration to simulate typical usage per user’s manual. When the EUT is table top equipment, it is placed on table 0,1m above ground reference plane. When EUT is floor standing equipment, it is placed on the 0,1m insulation above the ground reference plane. On AC mains power ports built-in coupling decoupling network is used to couple EFT/Burst disturbance voltage. For DC/telecommunication/signal ports capacitive clamp is used. Polarity of EFT/Burst disturbance voltage is changed during the test. Duration of test is not less than 1min, however, to avoid synchronization, the test time may be broken down into six 10s burst separated by a 10s pause. It is not intended that the burst is synchronized with EUT signals.

Service fields

analyse -
measurement -
testing -
Back to all
0 items in cart
Total: 0
You have no items in a cart
Go to checkout
Go Enquire