Share this
Map

Voltage dips/interruptions immunity

Accred­ited EMC test­ing, EMC pre-​compliance test­ing and EMC trou­bleshoot­ing to EMC com­pli­ance test­ing.

Contacts and Location

Description

Accred­ited EMC test­ing, EMC pre-​compliance test­ing and EMC trou­bleshoot­ing to EMC com­pli­ance test­ing.

Specification

The equipment was set up as per the test configuration to simulate typical usage per user’s manual. When the EUT is table top equipment, it is placed on table 0,1m above ground reference plane. When EUT is floor standing equipment, it is placed on the 0,1m insulation above the ground reference plane. The EUT for each selected combination of test levels and duration with a sequence of three dips/interruptions with intervals of 10s minimum time between each event. Each representative mode of operation is tested. The angle of applied dips/interruptions is defined 00 if not specified in test results. For EUT with more than one power cord, each power cord is tested individually.

Service fields

analyse -
measurement -
testing -
Back to all
0 items in cart
Total: 0
You have no items in a cart
Go to checkout
Go Enquire