Contacts and Location
Contact 1 | Uldis Sture |
---|---|
Enquire about this service | |
Organisational Unit |
Latvian Electronic Equipment Testing Centre (LEITC) - Latvia, Rīga |
Description
Accredited EMC testing, EMC pre-compliance testing and EMC troubleshooting to EMC compliance testing.
Specification
The equipment was set up as per the test configuration to simulate typical usage per user’s manual. When the EUT is table top equipment, it is placed on table 0,1m above ground reference plane. When EUT is floor standing equipment, it is placed on the 0,1m insulation above the ground reference plane. Surge generator was connected to reference ground plane via low impedance connection. If not mentioned, for DC power ports and interconnection lines and signal/telecommunication lines five positive and five negative surge pulses applied, for AC power line ports five negative and five positive pulses applied each at 00, 900, 1800, 2700 phase angle. Time between successive pulses was 1min or less if not otherwise specified.
Service fields
analyse | - |
---|---|
measurement | - |
testing | - |